Before fabrication
Nicholasville • Lexington • Georgetown • Frankfort • Richmond • Danville • Mount Sterling • Louisville • Central Kentucky
Get a Faster, Better-Scoped Quote
Send the measurements, access notes, timing, and photos that affect fabrication and installation. The form adapts to gate and railing projects so fewer details are missing during follow-up.
Use rough measurements to begin. ASB verifies final field dimensions and site conditions before fabrication.
What to have ready
- A wide photo showing the full opening, stair run, mounting area, or damaged assembly.
- Rough width, height, run length, stair count, and any slope or landing notes.
- Access constraints such as tight drives, occupied areas, shutdown windows, or limited equipment access.
- Gate power, operator, keypad, remote, intercom, loop, and safety device goals when applicable.
- Finish preferences and the target date or scheduling limitation that matters most.
Photos and preliminary measurements help us identify missing details before a site visit. They are not used as final fabrication dimensions.
Text photos insteadStep 1
Share the complete project
Include the surrounding opening, mounting area, access path, and desired finished result.
Step 2
We confirm missing details
ASB reviews the request and identifies measurements, photos, site conditions, or decisions still needed.
Step 3
Final dimensions are verified
Fabrication proceeds from verified field conditions and the approved scope—not unconfirmed rough measurements.